Equipment
Optimum Minerals Australia target is to provide Innovative solutions to increase productivity through the use of modern equipment and designs coupled with effective systems.
Dredging Design and Construct
Optimum Dredging Division and its design team over the last 25 years, has strived for the best custom design and technologies when constructing dredging units.
Our team through experience has earned a reputation one project at a time. The Optimum Dredge Team has dredged an array of materials under varying conditions and have overcome the challenges we’ve encountered through superior project management and expert problem-solving skills.
The variety of materials we have dredged includes mine tailings, ash, silts, clays, sands, alum and lime sludge, sewage sludge, animal waste, and many others.
Floating Pontoon
Floating Pontoon
De-Watering Pontoon
Auger Dredger
Dewatering and Beneficiation.
The OMA team has developed a system that operates with our dredging process to effectively dewater a variety of materials.
The Optimum Process Team has many years’ experience with hydro cyclone designs and Dewatering technologies. We can custom design and engineer for array of materials under varying conditions and have overcome the challenges we’ve encountered through superior project management and expert problem-solving skills.
Install and Retrieval of Pumps & Equipment
The Optimum Engineering and Design team have experience in designing and manufacturing Bore hole Retrieval units that are easy to transport and operate.
Sometimes borehole pumps and equipment need to be installed or removed for maintenance and re-installed back down a borehole. Our team has designed and manufactured machines to extract and install pumps in bore holes. These simple but effective units, are trailer mounted and offer both compact design and rugged construction.
Bore Hole deployment and retrieve trailer
Fines Mining
Bore Hole Retrieval